OK OK OK Productions, Home of Earthbag Building

Basic Procedure

Back to Basic Procedure      Previous   Next  8 of 11

The 3 keystone bags are filled in place, each one with the same amount of soil and tamped until they produce a wedge shape level with the surrounding fan bags.

  • HOME
  • Earthbag Building
  • Who We Are
  • Contact Us

Copyright © 2000 – 2008 OK OK OK Productions. All rights reserved.

Website developed and hosted by Circuit Riders, LLc, Pittsburgh PA, (412) 422-1611.